A 600-ton installation with barge crane logistics, restricted museum access, and complex post-tension slabs—TC Iron met every challenge. We floated steel through locks, erected 35-foot, 10-ton ladder columns without anchor bolts, and worked under a partially opened roof to protect sensitive exhibits. Both erection and detailing were completed a full week ahead of schedule.